Guide

What Happens on a Directional Bore Day

What Happens on a Directional Bore Day

A directional bore looks simple from the street, but a lot is going on below. Here is a typical day from setup to cleanup.

Setup and safety

The rig is positioned, cones and fencing go up and the crew reviews the plan.

Locate and pothole

Existing lines are located and exposed where the bore crosses them.

Drill the pilot hole

The steerable bit is tracked from above as it drills the planned path.

Ream and pull back

The hole is enlarged and the product pipe is pulled through in one piece.

Close the pits and clean up

Pits are backfilled, fluid is hauled away and the site is restored.

Want a pro to look? We will walk the route, locate what is underground and give you a plain written plan with a Free Estimate. Request it now or call (865) 433-0958.
Ready when you are

Let’s plan what goes underground.

Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.

  • We locate before we dig
  • Trench, bore or burst, whichever fits
  • Restored clean and recorded
(865) 433-0958

Request a Free Estimate

We reply fast and never share your details.

or call (865) 433-0958