Cobbles or boulders in the path
Other methods struggle.
A pneumatic ram drives steel pipe through the ground where boring would struggle.

Some ground fights back. Cobbles, old fill and boulders can stop an auger or a drill. Pipe ramming uses a pneumatic hammer to drive steel pipe straight through those layers, pushing soil aside or into the pipe so it can be cleaned out afterward.
We set the rammer in a pit on a guide, drive the pipe section by section, weld the joints and clean out the soil when the bore is finished. It works for short to medium crossings under roads, rail and buildings where precision at grade is less critical.
Other methods struggle.
Ramming is efficient.
Auger bores may jam.
A small pit is enough.
Is ramming the right fit?
On a guide rail.
Section by section.
Remove soil.
Or use the pipe as is.






Cobbles and fill.
Little disruption.
Driven straight.
Steel casing.
Usually short to medium distances. We confirm per site.
The ram makes noise, so we plan work hours.
Yes, with approvals.
It is good for straight shots, less so for tight grade.
Auger Boring and Steel CasingA steel casing is pushed beneath roads and rail with an auger boring machine.Explore
Road CrossingsBores under streets and highways keep traffic moving while utilities go in.Explore
Horizontal Directional DrillingSteerable drilling installs pipe and conduit under roads, drives and creeks without open tr…Explore
Pipe BurstingOld pipe is split in place while a new pipe is pulled into its path.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.