Busy street
Closing a lane is a problem.
Bores under streets and highways keep traffic moving while utilities go in.

Cutting a road for a utility crossing means closed lanes, detours and a patch that never looks right. A bore goes under the pavement instead, so traffic keeps moving and the road stays intact. It is the standard answer for crossings of busy streets.
We prepare a traffic plan, locate utilities, dig pits on each side of the road and install casing or product pipe by auger bore, jack and bore or directional drilling. Pits are shored and fenced, and the pavement is never broken unless the plan calls for it.
Closing a lane is a problem.
Strict approval rules.
A crossing is needed.
Cutting would ruin it.
Plans and traffic control.
On each side of the road.
Method matched to ground.
Casing or product.
Fenced and safe.






No road cuts.
Fenced and shored.
Pavement intact.
Built to the owner's rules.
Yes, from the road owner. We help prepare the submittal.
Often a day or two.
We bore the full width.
Yes, with the railroad's approval and specs.
Auger Boring and Steel CasingA steel casing is pushed beneath roads and rail with an auger boring machine.Explore
Horizontal Directional DrillingSteerable drilling installs pipe and conduit under roads, drives and creeks without open tr…Explore
Driveway and Sidewalk BoresShort bores pass lines under driveways, walks and landscaping without cutting concrete.Explore
Pipe RammingA pneumatic ram drives steel pipe through the ground where boring would struggle.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.