New building or service
A transformer pad is required.
Excavation, stone and concrete pads for pad-mount transformers and switchgear.

Pad-mount transformers sit on a concrete pad that must be level, strong and positioned with the right clearances and conduit openings. A pad poured badly settles and tilts, and a transformer that tilts is a problem for years.
We excavate, compact a stone base, set forms and rebar, place conduit sweeps in the right positions and pour the concrete. We finish the surface, protect it while it cures and coordinate with the utility on the delivery and setting of the transformer. Clearance rules around pad-mount equipment are strict, because crews need safe working room and the public needs protection. We lay out the pad with the utility's clearances in mind and add bollards where vehicles could reach it.
A transformer pad is required.
The pad must be replaced.
Replacement is needed.
Switchgear needs a pad.
Clearances and openings.
Compacted stone.
Accurate positions.
Level surface.
Utility sets the transformer.
Set to last.
Conduits in the right place.
Delivered on schedule.
Barriers and grading.
The utility or owner provides it. We build the pad and conduits.
Size depends on the equipment. The utility gives dimensions.
We can install them where needed.
Several days before heavy loads.
Duct Bank InstallationMulti-conduit duct banks set on spacers, often encased in red concrete for power and contro…Explore
Power Cable TrenchingPrimary and secondary power trenches with sand bedding, tape and proper separation.Explore
Pull Boxes and VaultsPull boxes, handholes and vaults set at grade so cable can be pulled and serviced.Explore
Commercial Site UtilitiesWater, sewer, storm, gas, power and telecom installed as one coordinated package for commer…Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.