New charging station
Infrastructure is needed.
Conduit, pedestal bases and trenching for electric vehicle charging stations.

Electric vehicle chargers need more than a plug. They need power delivered to the parking spaces, conduit for the wiring and concrete bases for the pedestals. Planning extra conduit now makes it simple to add chargers as demand grows.
We trench from the electrical room or transformer to each charger location, install conduit with spare capacity, set pedestal bases and bollards, and restore pavement. The electrician then pulls wire, sets chargers and commissions them. Think about the next five years, not just the first charger. A shared lot may start with two stalls and grow to twenty, and the easiest moment to prepare for that is while the pavement is open. We will sketch a phased layout with you so each new charger only needs wire and a pedestal, not a new trench.
Infrastructure is needed.
Several chargers are planned.
Heavy power is required.
Spare conduit is wise.
Charger count and spacing.
To each location.
Room to grow.
Level and secure.
Paving and stripes.
Conduit in place.
Spare capacity.
Protected equipment.
Lot looks new.
The electrician or charger provider does. We build the underground path.
Yes. It is far easier and less costly now than later.
Yes.
The electrical design sets limits.
Underground Electrical ConduitPVC and rigid conduit trenched and sealed for service entrances, feeders and branch circuit…Explore
Site and Parking Lot LightingTrenching, conduit and concrete pole bases for parking lot, drive and walkway lights.Explore
Duct Bank InstallationMulti-conduit duct banks set on spacers, often encased in red concrete for power and contro…Explore
Pavement Cut RestorationClean saw cuts, compacted base and new asphalt or concrete put streets and lots back right.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.