Crossing a road or driveway
Cutting would be disruptive.
Steerable drilling installs pipe and conduit under roads, drives and creeks without open trenches.

Horizontal directional drilling, or HDD, installs pipe and conduit along a planned underground path without digging a trench. A small steerable bit drills a pilot hole, the hole is enlarged to the right size and the product pipe is pulled back through. Roads, driveways, trees and streams stay where they are.
We locate and pothole existing utilities, plan the entry and exit points, track the drill head with a locator, steer around obstacles and manage drilling fluid so the hole stays open. Long strings of fused HDPE pipe are pulled in behind a reamer. Entry and exit pits are small and are restored when the bore is done.
Cutting would be disruptive.
A trench would hurt roots.
Open cuts are not allowed.
A long bore saves time.
Depth, path and pits.
Confirm other utilities.
Tracked and steered.
Enlarge the hole.
Restore the pits.






Roads and lawns stay in place.
Less closure and cutting.
Tracked in real time.
Long distances per day.
Runs of several hundred feet are common. The project sets the limit.
Yes, with approvals from the road owner.
A mix of water and clay that keeps the hole open and carries cuttings.
Often it saves money once restoration is counted.
Drilling Fluid ManagementMixing, recycling and cleanly disposing of drilling fluid keeps bores and sites under contr…Explore
Road CrossingsBores under streets and highways keep traffic moving while utilities go in.Explore
Fiber Conduit InstallationOrange innerduct and conduit trenched or bored so fiber can be pulled to homes and business…Explore
Vacuum Excavation and PotholingSoft digging with air and water exposes buried lines without damaging them.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.