New house under construction
Gas must be stubbed to the meter.
Trench work that brings natural gas to new homes, additions and commercial buildings.

A new build needs gas at the right time, which is usually before the driveway is poured and the landscaping goes in. Trenching early avoids cutting concrete later, and coordination with the builder keeps the schedule intact.
We walk the site with the builder, mark the route for gas, electric, water and sewer so lines do not cross badly, trench and bed the gas line with tape and tracer wire and leave it ready for the utility to connect. Where a drive or walk is already in place, we bore under it.
Gas must be stubbed to the meter.
The line must be extended.
A larger line is needed.
Trench now, save cutting later.
With builder and utility.
Avoid conflicts.
Tape and tracer wire.
Meter set and test.
Ready for paving.
Coordinated with builders.
Routes planned together.
Done before paving.
Clean handoff.
Before the driveway and landscaping if possible.
Yes, daily if needed.
Yes, with the utility.
We bore under it.
Gas Service Line InstallationThe line from the gas main to the meter, trenched or bored with tape and tracer wire.Explore
New Home Utility HookupsWater, sewer, gas, electric and fiber trenches from the street to your new home, planned to…Explore
Subdivision UtilitiesStreets of water, sewer, storm, gas, electric and fiber built for new neighborhoods.Explore
Horizontal Directional DrillingSteerable drilling installs pipe and conduit under roads, drives and creeks without open tr…Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.