New building
A lateral must be built.
The private line from your building to the main, sloped, bedded and fitted with a cleanout.

A sewer lateral carries waste from your building out to the main in the street. It needs steady slope, a solid bed, tight joints and a cleanout so it can be serviced. A new building or a replaced line is the time to set it up right.
We find the main and tap point, plan the route around trees and drives, trench or bore, lay pipe to grade and install a cleanout at the foundation or property line. After testing we connect to the building drain and restore the ground. Records go to you and the utility.
A lateral must be built.
Replacement is needed.
A second lateral is needed.
Access must be added.
Tap point and depth.
Around trees and drives.
Bedded and tested.
Easy future access.
To the building and yard.
Waste moves freely.
Easy service later.
Route planned.
Ready to use.
Usually the owner. We help sort out where the utility takes over.
Yes, often.
Yes, it is part of a good install.
Often a day or two for a typical home.
Sewer Main InstallationGravity sewer mains laid to grade on stone bedding with manholes and clean joints.Explore
Driveway and Sidewalk BoresShort bores pass lines under driveways, walks and landscaping without cutting concrete.Explore
New Home Utility HookupsWater, sewer, gas, electric and fiber trenches from the street to your new home, planned to…Explore
Manhole InstallationPrecast manholes set plumb on stone with sealed joints, inverts and frames at final grade.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.