New main or service
It must be tested before use.
Hydrostatic tests, flushing and disinfection that prove new water lines are ready for service.

A new water line is not finished until it has been proven. A hydrostatic test shows the pipe and joints can hold pressure, and flushing and disinfection make sure the water inside is safe to drink. These steps are required on most projects, and they protect everyone downstream.
We fill the line slowly, remove air, bring it up to test pressure, hold it for the required time and record the results. We then flush, disinfect with the specified method and take the samples the authority needs. If a test fails, we find and fix the leak and test again.
It must be tested before use.
Documents must be filed.
It must be disinfected.
A test will show it.
Pressure, time and method.
Slowly and safely.
Gauge readings logged.
To the specified method.
Records for the authority.
Tested and recorded.
Disinfected before use.
Leaks found early.
Ready for inspectors.
To find leaks and confirm the joints hold before the line is buried or used.
A chlorine treatment that makes new pipe safe for drinking water.
Usually a day or two, including sampling.
The utility and authority. We follow them.
Water Main InstallationNew water mains laid in ductile iron, C900 PVC or HDPE with restrained joints and tested li…Explore
Fire Hydrant InstallationNew hydrants set on restrained laterals with valves, stone drainage and clear access.Explore
Water Main Repair and ReplacementLeaking, broken or aging mains repaired quickly or replaced with new pipe.Explore
Water Service Line InstallationThe line from the main to your meter and building, installed in copper, PEX or HDPE.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.