New electric service
The utility needs a trench.
Primary and secondary power trenches with sand bedding, tape and proper separation.

Power utilities often require direct-buried or conduit cable in trenches built to their own standards. Depth, sand cover, separation from gas and water and warning tape are all specified, and the utility inspects the trench before cable is laid.
We build trenches to the electric utility's details, place clean bedding, leave the trench open for cable placement, add warning tape and backfill when the utility signs off. Crossings under roads and drives are bored or cased as the plan requires. Utilities often inspect the trench before the cable goes in, so we keep it open, clean and dry until they arrive. We photograph depths, separation from other lines and the bedding sand, and we keep those records with the job so an inspector never has to ask twice.
The utility needs a trench.
Primary lines must be installed.
Buried power is planned.
A long run is needed.
Depth and separation.
Clean sand cover.
Utility places it.
After inspection.
Lawn and paving.
Built to their details.
Open and ready.
Sand and tape.
Crossings bored.
The utility or electrician places the cable. We build the trench.
Depth follows the utility specification.
Yes.
We plan separation in advance.
Underground Electrical ConduitPVC and rigid conduit trenched and sealed for service entrances, feeders and branch circuit…Explore
Transformer Pad InstallationExcavation, stone and concrete pads for pad-mount transformers and switchgear.Explore
Overhead to Underground ConversionReplace poles and overhead lines with buried conduit and cable for a cleaner, safer propert…Explore
Subdivision UtilitiesStreets of water, sewer, storm, gas, electric and fiber built for new neighborhoods.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.