Storm damage to overhead lines
Burying lowers the risk.
Replace poles and overhead lines with buried conduit and cable for a cleaner, safer property.

Overhead lines are exposed to storms, falling trees and vehicles, and they can spoil a view. Burying them improves reliability and appearance, and it clears space for building and landscaping. The conversion needs planning with the utility and a well-built trench.
We coordinate with the power, phone and cable providers, trench the new route with conduit and pull boxes, leave stub-ups for the utility to connect and restore the ground. When the new line is live, the old poles and wires are removed by the owners of the lines.
Burying lowers the risk.
A cleaner site is wanted.
Clearance is a problem.
Constant trimming.
Power, phone and cable.
Avoid trees and structures.
Boxes at turns.
For utility connection.
Ground and paving.
No poles or wires.
Fewer outages.
Clear steps.
Lawn and drive.
The owners of the poles remove them after the new lines are live.
Yes, they control the final connection.
Yes, to protect roots.
It depends on length and utility scheduling.
Power Cable TrenchingPrimary and secondary power trenches with sand bedding, tape and proper separation.Explore
Underground Electrical ConduitPVC and rigid conduit trenched and sealed for service entrances, feeders and branch circuit…Explore
Fiber Conduit InstallationOrange innerduct and conduit trenched or bored so fiber can be pulled to homes and business…Explore
Horizontal Directional DrillingSteerable drilling installs pipe and conduit under roads, drives and creeks without open tr…Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.