New subdivision
Mains must go in before homes.
Polyethylene gas mains trenched, bedded and marked for new streets and developments.

New neighborhoods and commercial areas need gas mains before the first home or business can connect. The trench work for a main is precise: depth, separation from other utilities, clean bedding, tracer wire and warning tape all have to be right for the line to be accepted by the gas utility.
We trench to the utility specification, keep the right clearance from water, sewer and electric lines, bed the pipe in clean sand, lay tracer wire and warning tape and leave the open trench ready for the utility inspector and fusion crew. We also bore where a trench would be harmful or impractical.
Mains must go in before homes.
A main extension is needed.
Pipe is at the end of its life.
Gas must be relocated.
Depth and clearances.
Water, sewer and power.
Clean sand and grade.
A marker for the future.
With inspection.
Depth and clearance as required.
Tracer wire and tape.
Locates and potholing.
Compacted backfill.
We coordinate with the utility or fusion contractor on who performs it for each project.
Yellow. Always call before you dig.
Yes, in suitable ground.
The gas utility or authority for the project.
Gas Service Line InstallationThe line from the gas main to the meter, trenched or bored with tape and tracer wire.Explore
HDPE Pipe Fusion and TestingButt-fused polyethylene pipe joined above the trench, pulled in and pressure tested.Explore
Horizontal Directional DrillingSteerable drilling installs pipe and conduit under roads, drives and creeks without open tr…Explore
Utility LocatingElectromagnetic locating and paint marks show where buried lines run before anyone digs.Explore Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.