Boring and Trenchless

Auger Boring and Steel Casing in Knoxville, TN

A steel casing is pushed beneath roads and rail with an auger boring machine.

  • SurfaceLeft in place
  • MethodsBore, burst, ram
  • CrossingsRoads, drives, creeks
Auger Boring and Steel Casing in Knoxville, TN
Auger Boring and Steel Casing

Auger boring pushes a steel casing pipe through the ground while a rotating auger inside carries the soil back to the launch pit. It is precise, it keeps the road above stable and it leaves a casing that carriers such as gas, water or sewer can slide through.

We dig a launch pit and a receiving pit, set the boring machine on a rail to the right line and grade, push each section of casing and weld it to the last. Soil comes out through the auger. Once the casing is in place, the carrier pipe is installed inside with spacers and end seals.

Signs to watch for

When this is the right call

Crossing a state or county road

Casing is required.

Crossing railroad

Strict rules apply.

Gravity pipe needs exact grade

Auger bores are accurate.

Hard or rocky ground

Open trench is impractical.

How it goes

From first call to the finished job

  1. 01

    Plan line and grade

    Pits and casing size.

  2. 02

    Dig launch and receiving pits

    Shored and safe.

  3. 03

    Push casing with auger

    Section by section.

  4. 04

    Weld and verify

    Line and grade checked.

  5. 05

    Install the carrier pipe

    Spacers and seals.

See the difference

Drag the flag to compare.

After: The same lawn, compacted and sodded
Before: A raw trench scar across a front lawn
BeforeA raw trench scar across a front lawnAfterThe same lawn, compacted and sodded
After: The same street, patched flat and sealed
Before: A rough, sunken cut across a street
BeforeA rough, sunken cut across a streetAfterThe same street, patched flat and sealed
After: A clean shored trench with new color-coded lines
Before: An open excavation with old tangled lines
BeforeAn open excavation with old tangled linesAfterA clean shored trench with new color-coded lines
What you get

Benefits you can see and feel

Accurate

Line and grade held.

Road safe

No settlement above.

Casing protects

Carrier can be replaced.

Meets agency needs

Built to their specs.

Good questions

Auger Boring and Steel Casing: answers

What is a casing?

A steel pipe pushed under a road that holds the carrier pipe inside.

Is auger boring accurate?

Yes, very, which suits gravity sewer.

How big can casings be?

Many sizes, up to large diameters.

Do you need a permit?

Usually from the road owner. We help with the process.

Ready when you are

Let’s plan what goes underground.

Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.

  • We locate before we dig
  • Trench, bore or burst, whichever fits
  • Restored clean and recorded
(865) 433-0958

Request a Free Estimate

We reply fast and never share your details.

or call (865) 433-0958