Underground Utilities for Commercial Sites: Order of Work

Underground Utilities for Commercial Sites: Order of Work

A commercial pad needs every utility, and they must go in a sensible order. Getting the sequence right keeps the whole project on schedule.

Storm and sewer first

Gravity lines are set first because their grades cannot bend around other pipes.

Water and fire next

Pressure lines work around the gravity lines and need restraint and testing.

Gas and power

Dry utilities follow, with specified separation from water and sewer.

Communications last

Conduit and handholes go in once the main lines are placed.

Records at the end

As-built drawings capture what was actually installed.

Want a pro to look? We will walk the route, locate what is underground and give you a plain written plan with a Free Estimate. Request it now or call (865) 433-0958.
Ready when you are

Let’s plan what goes underground.

Tell us what you are building or fixing. We will walk the route, locate what is already there and give you a written plan with a Free Estimate and no pressure.

  • We locate before we dig
  • Trench, bore or burst, whichever fits
  • Restored clean and recorded
(865) 433-0958

Request a Free Estimate

We reply fast and never share your details.

or call (865) 433-0958