A commercial pad needs every utility, and they must go in a sensible order. Getting the sequence right keeps the whole project on schedule.
Storm and sewer first
Gravity lines are set first because their grades cannot bend around other pipes.
Water and fire next
Pressure lines work around the gravity lines and need restraint and testing.
Gas and power
Dry utilities follow, with specified separation from water and sewer.
Communications last
Conduit and handholes go in once the main lines are placed.
Records at the end
As-built drawings capture what was actually installed.